Aluminum scaffolding pipes have laying next plank over it. If the aluminum scaffold span of construction support is 7 feet,contractual company plans must overlap a minimum of 6 inches up to a maximum of 12 inches. But many construction companies have span of their plank support is 10 feet, the boards must overlap 12 inches;