naa gihapon uban tao diri wah ka gets... nag tuo sila mag tukod pa ug balai ang ts hahayz
naa gihapon uban tao diri wah ka gets... nag tuo sila mag tukod pa ug balai ang ts hahayz
aw payts raman diay kaau TS.. pero 16k gyud ihatag sa labor? as in murag dako2? oh well kung daghan sila aw ok ra sad ug polido mag work.. worth it ra pud. murag pwede paman siguro nah ipa-apas nimo ang paint pa gyud sa imong interior more or less 15k. then electric wiring w/ circuit breaker na dayon anyway imong hubby man kaha mag taud.
haha kamahal pud anang 6k para mag wiring sa aircon oie.. estimated nga price sa electrician.. ^_^ nga sa amo.a ako na mismo nag palit sa materials which is mas-makapili ug maka save then sa electrician pra mag taud around 1.5k-2k raman... hehe
mahala sad sa labor TS oi >.<
basig naay uban dri nga istoryans pdi ma kontak para ma minos ka bisag gamay lang thousand para mapuno sa budget sa materials
asa kaha ta makapalit barato ng tiles karon. mga suhito dre sa construction tabang pd mo namo. nindot ipalaminate flooring ang taas den tiles sa ubos.
... pwede man siguro. Amakan, kawayan ug nipa ang tukuron balay.
Ms. Yan... if you need electrical materials and wood products basin makaserbisyo ko nimo...![]()
PM me your requirements lang if interested ka![]()
hayzt, kakatake out ko lang nga haus ko sa deca 5, the contractor charge me 80k and here'e the qoutatation, goodluck n algn sakin kung makita nyo to, just want some advise, deca 5 ito na malapit sa grandwall, eto yung binigay nya kagabi, ok lang ba?
yung 1st floor ko, concrete polish gray cement lang, i dont want tiles p kasi gusto k talaga kahoy but mahal yung kahoy so para presentable and cheap red cement lng muna or gray cement.
Proposed labor cost: 38,000php
Proposed material cost: 42,000php (prize effective only for 1 week upon receiving of quotation).
Total cost: 80,000
Estimated Work timeline : 21 good working days
Scope of Work as follows:
1. Construction of kitchen area and slabs for roofing/second floor provision (per deca model house/show room).
2. Construction of lavatory and installation kitchen cabinets. (lavatory zinc and tiles will be owner supply)
3. Construction of cabinet/rack below staircase.
4. Construction of kitchen cabinet (per deca model house/show room).
5. Construction/division of rooms at second floor (1 room Japanese theme)
6. Installation of vinyl tile second floor. (vinyl tile will be owner supply)
7. Painting of walling and ceiling at ground floor and second floor (interior only)
8. Polishing/coloring of ground floor and kitchen flooring with (gray color)
9. Fabrication of portable island bar (ceramic material will be owner supply)
10. Installation of 3 set steel window per agreed design.
11. Cleaning of working place
usually ceramic tile computations kay if 16x16 tag PHP16 pud if mahangyo 10PHP. sa granite 60x60 kay tag P150 some P100 per sq meter.. if ang installer moingon nga adhesive gamiton paktay ka diha isa ka sako sa tile adhesive tag P125/25kilo then 1bag pila ray mataud ana na tiles kay pure na gamiton no fine sand...
diri sa amoa pag install sa tiles ang ginagamit portland cement ang ratio is 2sack fine sand per 1 sack cement. if magpa tiles ka ug stair, ang computation ana 200PHP per stair.
steel casement computation is PHP150/sq. ft., glass computation is expensive if binuuk dapat isa ka plego daun ipacutting sa ila with a cutting labor cost of PHP25, dapat kabalo ka sa sukod sa bintana arun dili mashort, mas better soba kay pde ra cuttingan on site...
mao ra ni ako ikahatag nga info karun, amoang balay la pa mahuman kapos budget hehehe...
Back to TOPIC: 100K is kulang kaayo.. tiles pa lang daan almost 30K more or less, then dapat ingnon nimo ang imo gipalitan na dapat same batch imo kuhaon arun same contrast lang, kay if not same batch naay dark naay light....