Update as of July 9, 2012. Footing and ground beam done. Backfilling and compaction done. Pouring of cement for the ground floor done, except parking lot area. Excavation for septic tank ongoing. Lay-out tasks ongoing for the ground floor structures.
Ground floor level from natural ground level = 0.8 meter
Road lot inside Lot C residences is 0.5 meter from natural ground level.